2021 Senior Projects Conference
Construction Engineering Technology
Room 220 Session: Join us on Zoom.
1:00 p.m. |
Capstone for ConstructionTeam Name: PADS Construction Team Members: Avery Coggins, Dawson Huckaby, Scott Quigley, Peyton Wicker Advisor: Mr. Reginald Jeter PADS Construction has been asked to bid and schedule the construction of the Rice Creek Waste Water Treatment Plant located in New Boston, Texas. We were provided a set of plans and specifications for the project which are to be used to find the needed quantities and dimensions for performing the takeoff for the project. We will use HCSS Heavybid software for completing the estimate and Primavera P6 software for the scheduling of the project. |
1:30 p.m. |
New Boston Rice Creek Waste Water Treatment PlantTeam Name: Triple B&C Team Members: Aliyah Ballot, Bryce Bonin, Peyton Braun, Wes Thibodeaux Advisor: Mr. Reginald Jeter Triple B&C Construction is considering bidding for the New Boston-Rice Creek WWTP project. After assessing and analyzing the plans, we decided that this would be a good project for us to bid on. The bid winner is to construct an Aeration Basin, including a 4” PVC underdrain and the select backfill and two clarification chambers. They must also construct the concrete structure of the Chlorine Contact Chamber. The bid winner must furnish and install the 4” diameter PVC pipe, set the equipment for the Aeration Basin and clarifiers, take care of any dewatering, and form, cure, patch, and rub the concrete structures that are visible above ground. In order for our bid to be successful, we must precisely calculate quantity take-offs for our materials; estimate the labor, material, and equipment; and estimate the production of work items. After that, we must produce or bid and create a CPM schedule to construct the project. |
2:00 p.m. |
New Boston Rice Creek Wastewater Treatment PlantTeam Name: Skyline Construction Team Members: Killian Conger, Leon Green, Jordan Johnson, Elizabeth McClure Sponsor: Heritage Constructors, INC Advisor: Mr. Reginald Jeter We have chosen to take on the challenge of putting together a bid and schedule for the New Boston Rice Creek Wastewater Treatment Plant. By using documents given to us from Heritage Constructors, INC, we will be using HCSS Heavy bid for the estimate of materials, labor, equipment, and Primavera P6 for the schedule. The portions of the Wastewater Treatment Plant for which Skyline Construction is responsible are as follows: Aeration Basin, Clarifiers, Chlorine Contact Chamber, PVC piping, installing equipment, assigning subcontractors to other related items, and earthwork. Skyline Construction will be constructing the concrete walls and foundations for the Aeration Basin, Clarifiers, Chlorine Contact Chamber. |
2:30 p.m. |
Rice Creek Wastewater Treatment Plant in New Boston, TexasTeam Name: Ten Point Construction Team Members: Braden Floyd, John Sanderson, Dakota Scott, Kade Weathers Sponsor: Heritage Constructors Inc. Advisor: Mr. Reginald Jeter Ten Point Construction will be responsible for the construction of a new wastewater treatment plant in New Boston, Texas. Several structures are necessary to complete the job. Ten Point Construction is responsible for creating the Aeration Basin, Floating Aerators, two 65ft Clarifiers, and the Chlorine Contact Chamber. The project will consist of excavation and backfilling for a large portion of the lot, particularly for the Aeration Basin’s surrounding PVC Drain Line. Ten Point will be estimating the materials/equipment needed, as well as the labor. Work required for other portions of the project will be subbed out. |
Room 222 Session: Join us on Zoom.
1:00 p.m. |
Mountain Creek Regional Wastewater System Peak Flow StorageTeam Name: Good Construction Co. Team Members: Saul Garza, Will Hilburn, William Skinner, Jacob Smith, William Tosten Sponsor: Heritage Contractors, INC Advisor: Mr. Reginald Jeter Our company, Good Construction Co., has been tasked with building the Mountain Creek Regional Wastewater System Peak Flow Storage project. This is an update to the current wastewater treatment plant in Midlothian, Texas, that includes the addition of a coarse screen and peak flow storage basin and the expansion of the existing influent pump station. We will be performing the quantity take-off for the materials; estimating the materials, labor, equipment, and production for the work items; developing a bid package that includes bonds, insurance, general conditions, overhead, and profit; and creating a CPM schedule to construct the project in the allotted project time. |
1:30 p.m. |
Peak Flow Storage Facility for TRATeam Name: TBPK Contractors, LLC Team Members: Turner Bridges, Blake Canales, Pete Carroll, Kevin Jameka Sponsor: Heritage Contractors, INC Advisor: Mr. Reginald Jeter TBPK Contractors, LLC is tasked with the reconstruction of a peak flow storage facility for the Trinity River Authority of Texas Mountain Creek Regional Wastewater System. The job site is located at 1717 Auger Road, Midlothian, Texas 76065. The scope of work will include, but is not limited to, excavation of the storage basin, construction of concrete structures, installation of PVC piping, equipment, dewatering, formwork, and construction of concrete. The estimate will use HCSS HeavyBid, while the scheduling portion will come from Primavera P6. |
2:00 p.m. |
TRA MCRWS Peak Flow StorageTeam Name: H.C.A Construction Team Members: Abraham Delfin, Silas Knight, Nathan McClain Advisor: Mr. Reginald Jeter H.C.A Construction has been tasked with the construction of a peak flow storage for the Trinity River Authority Mountain Creek Regional Wastewater System. The project will include construction of the following: 7-million-gallon peak flow storage basin, entrance improvements at two locations, the security fence, a new influent pump along with the piping, hoist structure, electrical upgrades, and associated civil improvements. The project will include an estimate that will be completed using HCSS Heavybid and a schedule that will be completed using Primavera P6. |
2:30 p.m. |
Trinity River Authority – Peak Flow Storage BasinTeam Name: RBTJ Contractors Team Members: Russell Daniels, Brad Dearing, Jaylen Giesbrecht, Trey Hammons Sponsor: Heritage Constructors Inc. Advisor: Mr. Reginald Jeter Acting in conformance with The Trinity River Authority of Texas, RBTJ Contractors will be estimating and bidding on the addition of a Peak Flow Storage Basin to the existing Mountain Creek Regional Wastewater Storage System. Various outlying structures alongside the basin, as well as demolition of some existing site elements, will also be included for consideration. Forming of the bid and schedule will be conducted with HCSS Heavybid and Primavera P6, and general project outlines for construction methods and site planning will be achieved using Bluebeam Revu. |
3:00 p.m. |
Kinsey Scout Reservation DamTeam Name: Wilson & Sons Construction Company Team Members: Daniel Beck, Colton Moore, Walker Simmons, Todd Wilson Advisor: Mr. Reginald Jeter This is a 28.7’ zoned earthen embankment dam on a tributary of Keatchie Bayou. It is currently under construction and when completed will have a maximum storage capacity of 196.4 ac-ft. The pool level is maintained by a siphon pipe, with an armored principal spillway and a grass emergency spillway. Our Construction Engineering Technology Capstone group is working alongside the Civil Engineering Capstone group to provide a cost estimate and construction time estimate. |